Monday, February 28, 2011

Stream Table 3.3 – Group 2

Stream has cleared its self out.  The sediment shaker has been modified, a pen has been taped to the feeder tube to straighten it (to help avoid clogs), and the pinch on the tube has been lowered to the end of the feeder tube.  The sediment shaker was on this morning (2/28/2011), but was not flowing, so I (Sara) tapped the end of the feeder tube a few times, and it started slowly flowing again.

Pictures of the altered sediment shaker:



Pictures of the meander on the stream table:



No comments:

Post a Comment